Image by Mariakray from Pixabay

After a hot summer without a pool, Friends of the Pool is raising funds to patch the pool liner to keep the pool open this summer.

The liner costs $160,000 and will extend the life of the pool for five to seven years. The last liner was replaced eight years ago.

The Wagner Memorial Pool is at a crossroads. It was built above a fluctuating water table which, over 60 years, created significant cracks in…

I am the founder and editor of Methow Valley Examiner, an online publication for locals, by locals.

Leave a comment

Your email address will not be published. Required fields are marked *